Vossloh USA - Jump to Home

Vossloh Fastening Systems References

References within the USA:
First Installation on BNSF track:
Mountainair, NM in April 2006
- Installation of 200 ties
- Curvature 2.7°
- Annual tonnage about 75MGT
Essex, MT in September 2006
- Installation of 200 ties
- Curvature 7.5°
- Annual tonnage about 60MGT
Crawford, NE in October 2007 (Powder River Division)
- Furnishing tight curves
- Installation of 1,400 ties
- Curvature 8°
- Annual tonnage about 60MGT
- Unit Coal Trains!
Maupin, OR in October 2007
- Furnishing tight curves
- Installation of 1,100 ties
- Curvature 12.5°
- Annual tonnage about 75MGT
Stanwood, WA in April 2008
- Installation of 3,000 ties
- Annual tonnage about 40MGT
Skykomish, WA in May 2008
- Installation of 21,000 ties
- Several tight curves and steep gradient
- Annual tonnage about 60MGT
Cajon Pass, CA in September 2008
- Ongoing installation in California
- Tight curves and steep gradient